Product Detail :
|
Design & construction of twin tunnel using natm and cut & cover method from km 24.880 to km 29.580 1 design & installation of ballastless track (excluding supply of rails) from km 24.856 to km 29.680 1 detailed design, supply, installation, testing & commissioning of general electrical services including supply, erection, testing and commissioning of 11kv ht/lt power and control cable network, gis substation (11/0.433) kva, tunnel lighting system, etc. from km 24.880 to km 29.680 1 design & construction of embankment, bridges and other miscellaneous works from km 12.00 to km 18.00.
|